May I run a separate electrical service to an accessory structure?
Yes, however, the Building Inspector must approve the plans before the application is accepted and there is a $50 electrical inspection fee.
Do I need a permit to install a stand-alone generator?
Yes, an electrical permit is required and there is a $50 electrical inspection fee.
Is there a minimum service requirement?
Yes, 100 amps is the minimum service requirement.
Are metal roofs permitted?
Yes, standing-seam or other professionally-installed metal roofs are permitted in all Agriculture and Single-Family Residential Districts. Tin roofs are not permitted.
May I install the roof on my home?
The owner may install the roof on non-commercial buildings. If anyone other than the owner will be installing the roof, the individual must be licensed to roof by the State of Illinois.
Do I need a permit to build a deck?
Yes, a building permit is required to build a deck.
Are there height and space requirements for deck railings?
Yes, the minimum height requirement for deck railings is 36 inches. If spindles are used, there must be no more than four (4) inches of space between spindles. If there are four (4) or more stairs leading to the deck, handrails are required.
How much does a deck permit cost?
A deck permit costs $0.15 per square foot of deck space plus a $30 final inspection fee.